Off-plan purchase checklist: 12 things to check before you sign
From the building permit and guarantee to the form of the contract and the delivery specification, the points to check one by one before buying an off-plan home in Türkiye, and what to look for in each.

Buying off-plan means making a decision today about a building that is not yet finished. Price matters, of course, but what gives a price its meaning is the strength of the documents, the company's track record and the contract terms behind it. The list below is designed for you to go through point by point before signing. For each item we explain briefly what to ask for and what to watch out for.
1. Building permit
A prepaid housing sales contract cannot be signed for a project without a building permit. Ask for the permit's date and number, and check that the block and parcel numbers on the permit match the property where your unit is located. You can also confirm the permit details with the municipality responsible for the project.
2. Condominium easement (kat irtifakı)
A condominium easement is a right registered at the land registry for the units of a building yet to be completed. If one has been established, the title can be transferred while construction is under way. If not, the contract should state clearly when and on what condition the title will be transferred.
3. The developer's track record
Look into the projects the company has delivered before, when they were handed over compared with the planned dates, and whether occupancy permits were obtained. If possible, visit a completed project and talk to the residents. Past delivery performance is the strongest indicator of what to expect.
4. Guarantee
In projects with 30 or more units, the seller must provide completion insurance, a bank letter of guarantee or a similar security before selling. You should see in the contract and its annexes which guarantee has been provided, by which institution and what it covers.
5. Pre-contract information form
The seller must give you a pre-contract information form at least one day before the contract. It sets out the total price, payment plan, handover date, the provisions that apply in case of delay and your right of withdrawal. Compare the form with the contract; the two should not differ.
6. Form of the contract
A prepaid housing sales contract must be executed at the land registry office or before a notary. Paying on the strength of a simple document signed at the sales office may deprive you of the protections the law provides. Before paying a deposit, establish when this step will take place.
7. Definition of the unit
The contract should state the block, floor, unit number and net and gross areas, with the floor plan attached as an annex. Net area is the sum of the interior surfaces of the rooms; gross area also includes walls and sometimes a share of common areas. Compare prices on the same basis.
8. Payment plan and total price
The down payment, instalments during construction, the amount due at handover and any post-handover terms should be shown separately, with the total calculated. Check whether payments are linked to a currency or an index and whether VAT is included in the price. Make every payment through a bank, to the account named in the contract.
9. Handover date and delays
The handover date should be stated by day and month. The law requires the home to be transferred or handed over within 36 months of the contract at the latest. Check whether the contract provides for compensation or rent payments in the event of delay.
10. Delivery specification
The materials to be used in each room, including flooring, kitchen cabinets and worktops, bathroom fittings, door and window systems and the heating and cooling solution, should be listed in an annex to the contract. A specification without brands and models, relying on general phrases such as "first-class materials", can lead to disputes at handover.
11. Common areas and service charges
It should be clear which units the parking spaces, storage rooms, shared facilities and landscaped areas belong to and how they will be used. Ask about the site management plan and the estimated service charge. Service charges directly affect net returns, particularly for buy-to-let purchases.
12. Withdrawal and termination rights
You may withdraw within 14 days of the contract without giving a reason or paying a penalty. After that, within 24 months, you may terminate with compensation of between 2% and 8% of the contract price. If the seller has breached the contract, termination carries no compensation. Check that these rights are correctly reflected in the contract.
Preparing for handover day
At handover, walk through the home with a checklist: cracks in walls and floors, doors and windows opening and closing properly, leaks in the plumbing, working sockets and whether the materials match the delivery specification. Record any defects in a written report and keep a copy. Remember that utility subscriptions cannot be opened without the compulsory earthquake insurance (DASK).
In short
- Do not pay before seeing the permit and condominium easement documents.
- Sign the contract at the land registry or before a notary.
- Put the total price, payment plan and handover date in writing.
- Ask for brands and models in the delivery specification.
- Make every payment through a bank.
Sources
- Consumer Protection Law No. 6502, Articles 40 to 46
- Regulation on Prepaid Housing Sales (Official Gazette, 27.11.2014, No. 29188); Ministry of Trade announcement: https://ticaret.gov.tr/duyurular/on-odemeli-konut-satislari-hakkinda-yonetmelik-onemli-duzenlemeler-getiriyor
- Condominium Law No. 634
This guide is for general information only and does not constitute legal advice. We recommend consulting a lawyer before signing.