Handover checklist: what to check room by room and which documents to collect
The checks to carry out when taking delivery of an off-plan home, recording defects in the handover report, the documents to collect, the first things to do and your legal rights if defects appear.

Handover day is the most exciting moment of an off-plan purchase. Rushing it, however, can create problems that are hard to fix later. This guide summarises how to prepare for handover, how to check the home room by room, which documents to collect and what your rights are if you notice a defect.
Before handover
- Confirm the handover date and time in writing; a daylight handover makes defects easier to spot.
- Bring your contract, the delivery specification and the floor plan.
- If possible, bring someone with building knowledge.
- Ask in advance whether the occupancy permit (iskân) has been obtained.
Room-by-room checks
- Walls, ceilings and floors: cracks, damp stains, paint defects, lifting or gaps in floor coverings.
- Doors and windows: smooth opening and closing, locks, seals and insulation, scratches or cracks in the glass.
- Bathrooms and wet areas: water pressure at taps and mixers, drainage, leaks, sealant and grouting, ventilation.
- Kitchen: cabinet doors and hinges, worktop surface, built-in appliances working.
- Electrics: every socket, switch, the fuse board and lighting points.
- Heating and cooling: boiler or central system, radiators or underfloor heating, air-conditioning provision.
- Balconies and terraces: drainage falls, drains, railing stability.
- Conformity of materials: brands and models used match the delivery specification.
Common areas
Check whether parking, storage, lifts, shared facilities and landscaping have been completed as described in the contract and marketing materials. Get the numbers of your parking space and storage unit in writing.
The handover report
Have every defect and omission you notice recorded in the handover report, with photographs, and keep a copy. Do not sign a document with general wording such as "received, no defects" before you have finished your checks. Ask for a reasonable deadline for remedying defects.
Documents to collect
- The handover report
- Keys and any cards or remote controls
- Appliance warranties and user manuals
- The energy performance certificate
- The management plan and site rules
- Meter numbers and opening readings
- Occupancy permit details
First things to do
- Take out compulsory earthquake insurance (DASK); it is required for electricity and water subscriptions.
- Open electricity, water and gas subscriptions in your name.
- Inform the site management and find out how service charges are paid.
- Consider taking out home insurance.
- Keep track of your title record and the conversion to condominium ownership.
If a defect appears later
For homes bought as a consumer, liability for defects runs for five years from handover; this period does not apply in cases of gross negligence or fraud. Notify the developer of any defect promptly and in writing. Depending on the situation, the consumer may choose free repair, a price reduction, replacement with a defect-free equivalent or termination of the contract. If no solution is reached, you can apply to a consumer arbitration committee or consumer court.
Sources
- Consumer Protection Law No. 6502, Articles 8 to 12 (defective goods and limitation periods)
- Zoning Law No. 3194, Article 31 (building use permit)
- Condominium easement, condominium ownership and occupancy permits, Eurasian Projects
- Your rights in a prepaid home purchase, Eurasian Projects
This guide is for general information only and does not constitute legal advice.